Open cast coal mine capacity- 2.0 million tan/year and 2.7 million tan/year (peek) 08/02/2016 : 3. M/s Kusmunda open cast coal mine,SECL : P.O – kusmunda, dist-korba: Application date 27/01/2016-- EI-07/KRB/2016 date 08/02/2016: Mining of coal- 26 million tan/year: 08/02/2016 : 4. Sub area manager, M/s Amera open cast coal mine, vishrampur ...

Đọc thêm

FOR 26.00 MTY OF KUSMUNDA OPENCAST PROJECT A. SPECIFIC CONDITIONS: (i) Condition: - The maximum production from the mine at any given time shall not exceed the limit as prescribed in the Environmental Clearance (EC). Compliance: - Agreed (ii) Condition: - The validity of the EC is for the life of the mine or as specified in the EIA

Đọc thêm

Cover photo: Kusmunda open cast mine, as seen from Barkuta village, April 2014. Front inside photo: Mining at the edge of Barkuta village, May 2016. Back inside photo: A mining truck heads down into the Tetariakhar mine, Basiya village, July 2014. Back photo: A Binjhwar adivasi woman who lives near the Basundhara-West mine, September 2014.

Đọc thêm

At Kusmunda Opencast Project, the life of pick in Upper Kusmunda seam is 651 hours and in Lower Kusmunda seam is 765 hours. The study …

Đọc thêm

Gevra, Kusmunda, and Dipka open cast mines are the mega projects of SECL and have a huge bearing on its annual coal production. For coal mining …

Đọc thêm

It will be an integral part of the Kusmunda open-cast coal mine, one of three mines operated by the SECL in Korba coalfields with estimated reserves of more than 10 billion mt. CIL currently operates 15 washeries. Three non-coking coal washeries with feedstock capacity of 13.5 million mtpy and 12 coking coal washeries with feedstock capacity of ...

Đọc thêm

The Gevra open cast produces 1.10 lakh MT of coal on a daily basis, Deepka mine produces about 90,000 MT of coal daily, Kusmunda mine produces about 40,000 MT coal daily, while Manikpur mine produces about 10,000 MT coal daily. The figures are, however, for normal days.

Đọc thêm

The largest project cleared was for Coal India subsidiary South Eastern Coalfields' Kusmunda opencast coal mine in Chhattisgarh, which will touch 62.5 million tonne at its peak capacity. Clearance was also accorded for Eastern Coalfields Rajmahal opencast coal mine project in Jharkhand with an annual production capacity of around 24 million ...

Đọc thêm

Kusmunda Open Cast Mine. Kusmunda Open Cast Mine has an annual capacity of 10 million tonnes. Pollution. In a paper on "Assessment of impact of Coal and Minerals Related Industrial Activities in Korba Industrial Belt Through Spectroscopic Technique" by Rajesh Kumar, Gurdeep Singh and Asim Kumar Pal, the authors highlighted, "Korba Coalfield has ...

Đọc thêm

Over view of Mines of Coal India, SECL, Kusmunda Open Cast Project on Jan 2018 .

Đọc thêm

KUSMUNDA, CHHATTISGARH Kusmunda is one of India's largest coal mines, covering about 2382 hectares in Korba district. South Eastern Coalfields Limited (SECL), which operates the mine, increased production capacity from 10 mtpa (million tonnes per annum) to 15 mtpa in 2009, to 18.75 mtpa in 2014 and 26 mtpa in early 2016.

Đọc thêm

To request permission, or for any other inquiries, please contact: [email protected]amnesty.in Cover photo: Kusmunda open cast mine, as seen from Barkuta village, April 2014. Front inside photo: Mining at the edge of Barkuta village, May 2016. All photographs by Aruna Chandrasekhar for Amnesty International India 2 "WHEN LAND IS LOST, DO WE EAT COAL?"

Đọc thêm

Mining purpose (in Ha.) : 1910.348 Ha iii) Total leasehold area( in Ha.) : 3510.348 Ha( As per 50 MTY PR) 1.1 Brief Geology of Mine: The area of Kusmunda Open cast mine is covered generally by soil/sub-soil and detrimental. Upper Kusmunda seam in –crops below a cover of 06m to 31m in an elliptical

Đọc thêm

Ariel View of 20,000 te Bunker & Coal Handling Plant of Kusmunda Open Cast Project

Đọc thêm

Coal India's Kusmunda opencast mine flows adjacent to a Hasdeo tributary. "I don't think a similar disaster will happen. [But] one cannot make predictions. This year rainfall was ...

Đọc thêm

FOR 26.00 MTY OF KUSMUNDA OPENCAST PROJECT A. SPECIFIC CONDITIONS: (i) Condition: -The maximum production from the mine at any given time shall not exceed the limit as prescribed in the Environmental Clearance (EC). Compliance: - Complied. Details of EC granted by MoEF & CC for Kusmunda OCP are given as under:

Đọc thêm

7 4.2 Map of Kusmunda Opencast Project, SECL, Korba, Chhattisgarh 22 8 6.1 Plan View of Haul Road Lighting Arrangement for the Mine. (a) Lighting Arrangement Provided on Both Side of the Road Dual Row Opposite (b) Lighting Arrangement in the Median 36 9 6.2 Plan View of Dump Road Lighting Arrangement for the Mine 37

Đọc thêm

Alert! Fall Protection. Accident Alerts ( In descending order of the date of occurence) :-. YEAR - 2021. Fatal Accident Occurred on 09.07.2021 at Central Asset Mines of M/s OIL. Fatal Accident on 23.06.2021 at Sonepur Bazari Open Cast Mine. YEAR - 2020. Fatal Accident on 23.07.2020 at Kusmunda OC Mine.

Đọc thêm

Gevra OCM is an existing mega opencast mine in the thick seam zone of Korba coalfields with a normative capacity of 35Mty and a peak capacity of 41.0Mty. The mine is under administrative control of Gevra Area of SECL. The Gevra OCM is flanked by another two mega opencast mines i.e. Kusmunda OCM (50Mty) in East and Dipka OCM (25Mty) in West.

Đọc thêm

Similarly, in the Kusmunda opencast mine, five surface miners, three electric hydraulic shovel (10.2 cum), 10 front-end loaders (10 cum), two crawler dozers (850 hp) and one wheel dozer (460 hp) are being procured and deployed. Out of these, one surface miner, six front-end loaders and one wheel dozer are due shortly.

Đọc thêm

The mine produces about 18.75 Mt 13e17 m, 11e12 m and 7e9 m, respectively. The direction of strike of coal per year. The total overburden handled is about is towards EeW with broad swings. The dip of the coal seam is 1 e 30.69 Mm3. The overview of the Kusmunda opencast project is 4 in northerly direction.

Đọc thêm

The illumination study was performed in Kusmunda opencast project, SECL,Bilaspur. It included an illumination survey of the existing lighting system at haul road, dump yard,coal & OB face followed by analysis & improvement measures. The lux meter used for the survey was Metravi1332. The illumination models for various working places in mine ...

Đọc thêm

The area of Kusmunda mining block is 10.66 sq.km. The area is under considaration for mining of Kusmunda Opencast Expansion Project (15 Mty). Occurrence of 3 nos. of coal seams have been proved in the block. These seams in descending orders are 'E' & 'F', Upper Kusmunda and Lower Kusmunda. Lower

Đọc thêm